F. g-switch functional check – item 4, G. performance testing setup, 40 g. performance testing setup – ACR&Artex C406-2 HM User Manual
Page 40
ACR ELECTRONICS, INC / ARTEX PRODUCTS
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
C406-2 (453-5000), C406-2HM (453-5001)
25-62-11
Page 40 of 87
JUN 20/13
SUBTASK 25-62-11-750-001
F.
G-Switch Functional Check – Item 4
CAUTION:
A JUMPER IS REQUIRED TO PERFORM THIS CHECK. DUE TO THE POTENTIAL OF
PHYSICAL DAMAGE IF THE JUMPER IS IMPROPERLY INSTALLED, THIS STEP SHOULD
ONLY BE PERFORMED BY AN EXPERIENCED TECHNICIAN/MECHANIC.
(1)
Reinstall the battery in accordance with SUBTASK 25-62-11-450-001 on page 74.
NOTE: If tests 5a through 5h are going to be performed, the battery may be temporarily
installed with only two screws, located on a diagonal from each other.
(2)
Perform this functional check within the first 5 minutes after the hour (UTC), as required by
AC 43.13-1, Chapter 12, § 12-22, Note 3.
(3)
Notify any nearby control tower of your intentions.
(4)
Install the 151-2012 test plug (receptacle) on the ELT plug or jumper ELT plug Pins 5 and 8.
NOTE: The ELT cannot be activated using this procedure unless Pins 5 and 8 on the ELT
plug are jumpered. See "Figure 21 Remote Switch Harness Wiring Diagram” on
(5)
Verify the ELT switch is in the “OFF” position.
(6)
Monitor 121.5 MHz on an AM receiver.
(7)
Activate the ELT by using a rapid forward (i.e., throwing) motion in the direction of the arrow
on the ELT label, followed by a rapid reversing action.
(8)
Verify activation by listening for the aural sweep tone on the receiver.
(9)
Reset the ELT by toggling the control switch to the “ON” position and then back to the “OFF”
position.
SUBTASK 25-62-11-750-002
G. Performance Testing Setup
NOTE: The ELT software routine logs battery life in 30-second increments. A minimum of 30
seconds is added to the battery usage total each time the ELT is activated and de-activated.
If the ELT is left activated beyond the first 30 seconds, additional time is added in 30-
second increments.
NOTE: Careful planning of the performance tests is necessary to avoid activating the ELT more
than necessary. Plan the performance testing in a manner that allows tests to be run
concurrently and test equipment settings to be quickly switched from one test to another.