B. canada, C. other countries – ACR&Artex C406-2 HM User Manual
Page 37
25-62-11
Page 37 of 87
JUN 20/13
ACR ELECTRONICS, INC / ARTEX PRODUCTS
DESCRIPTION, OPERATION, INSTALLATION AND MAINTENANCE MANUAL
C406-2 (453-5000), C406-2HM (453-5001)
SUBTASK 25-62-11-990-002
B. Canada
(1)
CAR Part VI, Standard 625, Appendix C, requires the ELT to be inspected at intervals not
exceeding 12 months.
(2)
All maintenance and testing shall be performed in accordance with the requirements of CAR
Part V, Standard 571, Appendix G, which requires:
(a)
Corrosion inspection;
(b)
Operational testing;
(c)
Performance testing, including:
1
Measured peak power after 3 minutes of operation,
2
Measured frequency after 3 minutes of operation,
3
Audio modulation, which shall be recognizable as a typical ELT signal,
4
Measured current draw in the “OFF” (ARM) and in the “ON” position, as specified
by the manufacturer, and
5
The automatic activation system.
SUBTASK 25-62-11-990-003
C. Other Countries
(1)
For all other countries, maintenance and testing shall be conducted in accordance with the
requirements of applicable national regulatory authorities and the requirements herein, as
applicable. Local regulations and requirements shall take precedence.