Installation installation, Installation, 1 installation site – STIEBEL ELTRON HDB-E Si 01.11.2012 - 31.01.2013 User Manual
Page 20: 2 factory settings
20
| HDB-E Si
www.stiebel-eltron.com
INSTALLATION
Installation
Flexible water connection lines
f If the appliance is installed with flexible water connection
lines, ensure that the pipe bends do not become twisted.
Pipe bends have a bayonet fitting and are installed inside the
appliance.
f Secure the back panel at the bottom with an additional
screw.
9.1 Installation
site
!
Material damage
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically near the draw-off
point.
The appliance is suitable for undersink and oversink installations.
Note
The appliance must be fitted to a wall with sufficient
load-bearing capacity.
Undersink installation
26
_0
2
_02
_1
37
3
1
2
1 Cold water inlet
2 DHW outlet
Oversink installation
2
6
_0
2_0
2_
1
3
7
4
1
2
1 Cold water inlet
2 DHW outlet
9.2 Factory
settings
The appliances are prepared in the delivered condition:
- Power supply from “below”, installation on unfinished walls
- Water connection, installation on unfinished walls
10. Installation
This chapter describes installation in accordance with the factory
settings.
For further installation options, see chapter “Installation alterna-
tives”.
26
_0
2
_02
_1
3
6
7
f Open the appliance.
2
6
_0
2_0
2_
1
1
0
1
f Press the two locking hooks and remove the lower part of
the back panel towards the front.
2
6
_0
2_0
2
_0
8
1
0_
f Mark out the holes to be drilled; see chapter “Specification /
Dimensions and connections”.