Toshiba RAV-SM800XT-E User Manual
Page 80
No.
Part name
Reactor
Procedure
1) Perform works of items 1 of
and
.
2) Take off screws fixing the reactor.
(Ø4 x 10L , 2 pcs. per one reactor.
An outdoor unit has two reactors on the
partition plate.)
Remarks
Reactor
Partition plate
Screws
Positioning extrusion
PMV body
PMV coil
Concavity
1. Detachment
1) Perform works of items 1 of
and
.
2) Remove the coil from PMV body while
pulling it upward.
2. Attachment
1) Match the positioning extrusion of the coil
surely to the concavity of PMV body to fix it.
Pulse Modulating
Valve (PMV) coil
– 78 –
This manual is related to the following products: