2 unpacking the new ups equipment 50 kva, 3 inspection of the new ups equipment, Unpacking the new ups equipment 50 kva – Toshiba 4200FA CT/XT User Manual

Page 17: Danger, Toshiba

background image

TOSHIBA

2.2

Unpacking the new UPS equipment 50 kVA:

Upon receipt of the UPS, a careful inspection for shipping damage should be made. Units

shipped within North America are shrink-wrapped; those outside North America are crated.

DANGER

TOP HEAVY EQUIPMENT. IMPROPER LIFTING CAN RESULT IN INJURY OR DEATH.

D

3. Place the tie brackets in the slots at

e

LIFT AND MOVE CAREFULLY AND ONLY WITH ADEQUATE EQUIPMENT AND TRAINE
PERSONNEL. THIS EQUIPMENT WILL TIP OVER EASILY UNTIL FIXED IN PLACE.

1. Remove packing material.

the lower end of the ramps.
SLOWLY roll the unit down th
ramp.

2. Unbolt the rails from both the unit

and the shipping pallet.

Place the rails on the front of

the

pallet.

Use the four 1/2 x 3" bolts to

secure the rails to the shipping

pallet.

Attach the rails as shown in the

front to the front of the pallet.


1a. For international units, remove

the screws that attach the

shipping crate to the pallet.

Remove the crate and foam

packing

material.

4200FA CT/XT User’s Manual

16