OPERATION
Boom
Operation Section 3-11
©2011 Alamo Group Inc.
OPERA
TION
6.2 Boom Unit Pre-Operation Inspection and Service
Inspect and service the boom arm and head prior to operation. Damaged and/or broken parts should be
repaired and/or replaced immediately. To ensure the unit is ready for operation, conduct the following:
OPS-B- 0020
FRAME ASSEMBLY
•
Inspect condition of mounting frame weldment.
•
Inspect condition of Swivel Assy.
•
Ensure all bolts and screws are in position and
are properly torqued.
•
Ensure all pins are in place and fastened with
screws.
•
Ensure frame is properly mounted to tractor
and hardware is propely installed and
tightened. OPS-B- 0021_D
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
attaching hardware. Serious injury may occur from not maintaining this
machine in good working order.
(SG-21_A)
The operator’s manual and safety signs affixed on
the unit contain important instructions on the safe
and proper use of the equipment. Maintain these
important safety features on the implement in good
condition to ensure the information is available to
the operator at all times.
•
Ensure all safety signs are in place and legible.
Replace missing, damaged, and illegible
decals. OPS-U- 0011_A
Turret Frame Assy.