beautypg.com

Installing the 4203 t1/e1 ima uplink dsl, Cable ferrite choke – Paradyne IP DSLAM GranDSLAM 4200 User Manual

Page 32

background image

2. Cabling

2-8

January 2004

4200-A2-GN20-40

Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke

The 4203 T1/E1 IMA Uplink is shipped with a ferrite choke that must be installed
on the DSL cable(s). One choke can accommodate 1–8 cables.

Procedure

To install the ferrite choke onto the DSL cable(s):

1. Open the ferrite choke and place it around the cable(s) as close to the cable

connector on the uplink module as possible.

2. Close the two halves around the cable and snap the choke shut, pressing

down on the plastic latch to secure it.

3. To prevent the ferrite choke from slipping down the cable, install a tie wrap

behind the ferrite choke as shown.

02-17334

Plastic

Latch

Tie

Wrap