3 mechanically joining the sections – Powerware 9395 UPS and Plus 1 UPS 650825 kVA User Manual
Page 51
UPS SYSTEM INSTALLATION
EATON Powerware
®
9395 UPS (650–825 kVA) Installation and Operation Manual
S 164201725 Rev 2 www.powerware.com
4−5
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Right Side Shipping
Bracket
Figure 4-4. Removing the UPM Section Right Side Shipping Bracket
4.3
Mechanically Joining the Sections
NOTE The following procedure permits the UPS sections to be installed in a location where there is limited
space to slide the sections together from the sides.
NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of the
section (see Table 3-1 on page 3−2 for cabinet weight).
1.
Using a forklift, move the UPM section to the final installed location.
2.
Remove one top screw and two bottom screws securing the UPM section
wireway panel (see Figure 4-5). Lift the panel straight up to remove it from the
panel hanger brackets at the top of the cabinet.
3.
Remove the screws securing the top and bottom internal safety shield panels
and remove the panels. Retain the hardware for later use.
4.
Remove the screws securing the corner channel and remove the channel (see
Figure 4-5). Retain the hardware for later use.