Precision Trading 60 R3.0 User Manual
Page 33
Operator Manual, Supercharger 60
R3.0
Page 33 of 62
7. INSTALLATION
7.1 BENCH SPACE.
7.1.1. The Charger-Analyzer system occupies 19" x 17" (48.3 cm x 43.2 cm) of table
top space for the charger and 10" x 25" (25 cm X 63.5 cm) for the Temp-Plate.
7.1.2. Allow also at least 6" (15.2 cm) of separation from the wall and adjacent
equipment, in order to maintain proper air flow (VITAL!).
7.1.3. NOTE 1: In non air-conditioned rooms or if other heat dissipating equipment are
nearby, it is recommended that circulating or extracting fans be used to aid in the
heated air removal.
7.1.4. NOTE 2: Operation in dusty or otherwise "dirty" air environments will severely
reduce the cooling capacity of the fans and lead to premature failure.
7.2 LINE VOLTAGE.
7.2.1.
Connect the unit to a wall receptacle NEMA 6-30R, 230V (re-wire the
transformers input for 240V or 208V operation) with a 30 AMP capacity. This
line must be a dedicated line, originating at the breakers box and must be
protected with a motor load rated circuit breaker. Sharing of the line with other
equipment may result in erratic operation of the Charger-Analyzer and the other
devices connected to the same line.
7.2.2. NOTE: Operation of this unit with a "soft" line or with a line voltage 10% above
or below the nominal 208/230/240VAC will result in erratic operation and may
also lead to equipment damage if large voltage surges occur.
7.2.3. Power (Mains) Wiring Diagram
Figure 3 - Line Voltage Wiring, 115V