2.2.1 The test with AC voltage is only for production purpose,

Service center shall use DC voltage.

2.2.2

2.2.3

2.2.4 The grounding blade or pin of mains plug must be

conducted with accessible metal parts.

The minimum test duration for Quality Control Inspector
must be 1 minute.No breakdown during the test.

The test voltage must be maintained within the specified
voltage + 5%.

All units that are returned for service or repair must pass the
original manufactures safety tests. Safety testing requires both

and

testing.

Hipot

Ground Continuity

HI-POT TEST INSTRUCTION

1. Application requirements

2. Test method

1.1 All mains operated products must pass the Hi-Pot test as

described in this instruction.

1.2 This test must be performed again after the covers have

been refitted following the repair, inspection or modification
of the product.

2.1 Connecting conditions

2.1.1 The test specified must be applied between the parallel-

blade plug of the mainscord and all accessible metal
parts of the product.

2.1.2 Before carrying out the test, reliable conductive

connections must be ensured and thereafter be
maintained throughout the test period.

2.1.3 The mains switch(es) must be in the "ON" position.

2.2 Test Requirements

All products should be HiPot and Ground Continuity tested as
follows:

Test

2820VDC

1700VDC

Test current:

voltage

(2000VAC)

(1200VAC)

25A,AC

Test time:

Test time 3 seconds

1 second

3 seconds(min.)

(min.)

Resistance

required:

Trip

set at 100 uA

5 mA

<=0.09+R ohm,

current

for Max.

R is the

(Tester)

limitation; set

resistance of

at 0.1 uA for

the mains cord.

Min. limitation

Ramp

set at 2

time

seconds

Condition

HiPot Test for

HiPot Test for

Ground Continuity

products where

products where

Test requirement

the mains input

the mains input is

range is Full

110V AC(USA

range(or 220V

type)

AC)

3. Equipments and Connection

4. Recording

3.1. Equipments

For example :
- ChenHwa 9032 PROGRAMMABLE AUTO SAFETY

TESTER

- ChenHwa 510B Digital Grounding Continuity Tester
- ChenHwa 901 (AC Hi-pot test), 902 (AC, DC Hi-pot test)

Withstanding Tester

3.2. Connection

Hipot and Ground Continuity testing records have to be kept for
a period of 10 years.

* Turn on the power switch of monitor before Hipot and

Ground Continuity testing.

Connect the "video cable"
or "grounding screw"
to the CLIP on your tester.

Video cable

(Rear view of monitor)

Connect the power cord
to the monitor.

Grounding screw

Power outlet

(ChenHwa 9032 tester)

Clip

Clip

Safety test requirements

86