Initial startup – Powerware 9355 User Manual
Page 52
OPERATION
EATON Powerware
®
9355 Parallel UPS (10/15 kVA) User’s Guide
S 164201601 Rev A www.powerware.com
46
Table 3. User Settings (continued)
Default Setting
Available Settings
Description
X-Slot Signal Input Activation Delay
0 through 65 seconds
5s
Input signal delayed shutdown delay
1 through 65535 seconds
120s
Site Wiring Fault Notice
Enabled/Disabled
Enabled
Reset Custom Event Settings
0 through 32
Total: 0/32
Auto Output Configuration
Enabled/Disabled
Enabled for initial startup
Disabled after initial startup
Initial Startup
Startup and operational checks must be performed by an authorized
Eaton Customer Service Engineer, or the warranty terms as specified in
the Powerware 9355 UPS (10/15 kVA) User’s Guide become void. This
service is offered as part of the sales contract for the UPS. Contact
service in advance (usually a two-week notice is required) to reserve a
preferred startup date.