beautypg.com

Troubleshooting & repair – Lincoln Electric PIPELINER 200 User Manual

Page 119

background image

MAIN GENERATOR FRAME REMOVAL AND REPLACEMENT PROCEDURE

WARNING

TROUBLESHOOTING & REPAIR

F-49

F-49

PIPELINER® 200

Service and repair should be performed by only Lincoln Electric factory trained personnel.

Unauthorized repairs performed on this equipment may result in danger to the technician

or machine operator and will invalidate your factory warranty. For your safety and to avoid

electrical shock, please observe all safety notes and precautions detailed throughout this

manual.
If for any reason you do not understand the test procedures or are unable to perform the

test/repairs safely, contact the Lincoln Electric Service Department for electrical trou-

bleshooting assistance before you proceed. Call 1-888-935-3877.

DESCRIPTION

This procedure will aid the technician in the removal and replacement of the main DC

generator frame.

MATERIALS NEEDED

Rope sling

Wood or steel blocks

Pry bars

9/16” Wrench

1/2” Wrench

7/16” Wrench

3/4” Wrench

Slot head screw driver

Wiring Diagram

Retur

n

to

Section

TOC

Retur

n

to

Section

TOC

Retur

n

to

Section

TOC

Retur

n

to

Section

TOC

Retur

n

to

Master

TOC

Retur

n

to

Master

TOC

Retur

n

to

Master

TOC

Retur

n

to

Master

TOC