Installation checklist – KVH Industries KVH TracVision User Manual
Page 10

Installation
54-0239
TracVision A5 Shop Manual
© 2004 KVH Industries, Inc., All rights reserved.
9
You affixed the antenna serial number label to the red
Activation Card.
9
You verified the roof rack crossbars are securely fastened
to the vehicle and are sturdy enough for the antenna.
9
You removed the antenna’s shipping restraints from below.
9
You used the proper tamper-resistant mounting hardware.
9
You allowed at least 1" of clearance between the antenna
and the vehicle’s roof.
9
You verified that the antenna is securely attached to the vehicle.
9
You used an Augat tool to attach the F-connector to the
antenna cable (if you cut the cable).
9
You connected the antenna cable, high-quality audio/video
cables, and RF converter cable securely to the receiver.
9
You connected the receiver’s power cable to +12 VDC
switched (accessory) power.
9
You placed the RF converter 3 feet away from the receiver and
other electronic devices.
9
You installed the receiver in a dry location away from any heat
sources, allowing 2 inches of empty space for ventilation.
9
You installed 2 “AAA”-size batteries in the remote control.
Installation Checklist
Effective April 2004
Subject to change without notice