beautypg.com

Gain access to the ac power sequencers, Reassemble the expansion cabinet – Sun Microsystems Sun StorEdge A3500FC User Manual

Page 18

background image

1-8

Sun StorEdge A3500/A3500FC Hardware Configuration Guide • December 1999

FIGURE 1-5

AC Power Sequencers—Ultra 2 Power Connector

To connect the power cord:

1. Gain access to the AC power sequencers.

See the documentation that came with the expansion cabinet.

2. Route the power cable from the Ultra 2 host under the expansion cabinet frame on

the same side as the power sequencer.

3. Connect the power cord from the Ultra 2 host into the top power connector of

either power sequencer (

FIGURE 1-5

).

The power connectors are located on the other side of the power sequencer from the
main switch.

4. Reassemble the expansion cabinet.

See the documentation that you received with the expansion cabinet.

Connect Ultra 2
power cord here

Ultra Enterprise
expansion cabinet
and StorEdge
expansion cabinet
power sequencer

1422 mm/56-inch
data center
expansion cabinet
power sequencer