beautypg.com

Options, Full galvanic isolation transformer, Cont') – MGE UPS Systems Comet TM 5 - 30 kVA User Manual

Page 42: Power connection diagrams

background image

10.4

Comet installation and user manual: E-6761200XT/FA

Merlin Gerin by MGE UPS SYSTEMS

full galvanic isolation transformer

(standard Comet equipment)

power connection diagrams

This option is required to achieve a downstream neutral system different from the
upstream neutral system. The transformer, installed in a cubicle of the same
design as the Comet cubicle, must be positioned:

between the low voltage switchboard and the input power switch for Comet

series 11 and series 33 (see figure 26);

between the Comet load output terminals and the load for Comet series 31

(see figure 27).

The cables requiring connection are indicated as bold lines.
For information on cable cross-sections, see the "appendices": "selection of cable
cross-sections" (the connection cable between Comet and the option is supplied).

Fig. 26

Fig. 27

XR5

XR4

transformer

load

XR1

Comet series 31

CB1

TR2

XR2

LV
switchboard

load

XR2

XR1

Comet series 11/33

XR5

XR4

transformer

LV
switchboard

TR2

CB1

options

(cont')