6.4
Comet installation and user manual: E-6761200XT/FA
Merlin Gerin by MGE UPS SYSTEMS
"Static bypass" 3 overload curve
operation
(cont')
1,05 1,1
1,3
1,5
10 mn
10 s
1 s
0,15 s
rated load
current In
1,7
1,9
2
1 mn
time
Fig. 22
overloads on 5 kVA Comet S11 or S31
For a major temporary overload
(greater than 1.5In)
:
The load is transferred to AC input power via the "static bypass" 3 for 5 seconds.
After that time, it is transferred back to the inverter.
If the overload persists, this sequence will be repeated 3 times in all before the
inverter is shut down and the supply of power to the load interrupted.
For a minor overload:
Minor overloads can be supplied by the inverter for a duration defined in figure 21
for an ambient temperature of less than 30
°
C. Above this temperature, a derating
coefficient k must be applied to the rated current and therefore to the overload
curve in figure 21:
■
from 30
°
C to 35
°
C: k = 0.9,
■
from 35
°
C to 40
°
C: k = 0.85,
■
above 40
°
C: k = 0.8.
Example: an overload current I can be supplied by the inverter for 1 minute
under the following conditions:
■
1.1 In < I < 1.3 In for an ambient temperature of 25
°
C,
■
1.1 x 0.9In < I < 1.3 x 0.9In for an ambient temperature of 32
°
C,
■
1.1 x 0.85In < I < 1.3 x 0.85In for an ambient temperature of 37
°
C,
■
1.1 x 0.8In < I < 1.3 x 0.8In for an ambient temperature of 42
°
C.
When an overload occurs:
■
the buzzer 17 sounds,
■
the orange "fault" light 19 goes on,
■
the inverter 7 shuts down at the end of its corresponding overload time,
■
the load is supplied by AC input power via the "static bypass" 3 ,
■
the green "load protected" light 21 goes off,
■
the red "load not protected" light 18 goes on.
The load is supplied via the "static bypass" 3 for 5 seconds, after which it is
transferred back to the inverter. If the overload persists, the inverter shuts down