Installation, Special precautions, Cont') – MGE UPS Systems Comet TM 5 - 30 kVA User Manual

Page 12: Connections, Electrical diagram for power connections

background image

Comet installation and user manual: E-6761200XT/FC

2.2

Merlin Gerin by MGE UPS SYSTEMS

special precautions

installation

(cont')

Note:
For Comet series 31 15/20kVA and Comet series 33 units, a clearance "e" of
5mm is required to the left of the optional cubicles for door opening.

ensure that clearance L1 to the left of Comet is greater than L for access to the

battery cells and L2 greater than 100mm (for ventilation);

ensure that clearance P1 in front of Comet is greater than P for servicing via

the front;

connection cables must be of th flexible type and sufficiently long to enable

forward movement of Comet without disconnection (allow an extra 1.5 meters);

additional cubicles (extended battery, auxiliaries, etc.) must be placed to the

right of Comet. If the above installation conditions are not respected,
maintenance and servicing of the unit may require system shutdown.

load cables must be run separately from all other cables (power supply or

computer system interconnection cables). They should not pass near
interference-emitting equipment or sensitive loads;

if Comet is installed with the "Teleservice" option, a telephone connector and

power supply must be provided for the modem used with it.

Connection cables should enter at the bottom:

in the back for Comet series 11 and series 31 5/7.5/10kVA;

in front for Comet series 31 15/20 kVA and series 33 10/15/20/30kVA.

Figure 9 presents a single-line electrical diagram for a typical installation.
The power cables requiring connection are shown as bold lines (see the
"appendices" for information on selecting cable cross-sections).

Fig. 9

connections

electrical diagram for power connections

Connection diagram for a single AC input

load

AC input

extended battery
cubicles (optional)

XR3

XR3

XR2

XR1

Comet