beautypg.com

Operating procedure photos – MITSUBISHI ELECTRIC MUY-GE09NA User Manual

Page 44

background image

44

OPERATING PROCEDURE

PHOTOS

2. Removing the inverter assembly, inverter P.C. board

(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the lead wire to the reactor and the following con-

nectors:


CN721 (R.V.coil) (MUZ)
CN931, CN932 (Fan motor)
CN641 (Defrost thermistor (MUZ) and discharge temperature

thermistor)

CN643 (Ambient temperature thermistor)
CN644 (Outdoor heat exchanger temperature thermistor)
CN724 (LEV)

(3) Remove the compressor connector (CN61).
(4) Remove the screws fixing the relay panel. (Photo 3)
(5) Remove the inverter assembly. (Photo 4)
(6) Remove the screw of the ground wire and screw of the

T.B.support. (Photo 4)

(7) Remove the screw of the PB fixture.
(8) Remove the relay panel from the PB support.
(9) Remove the inverter P.C. board from the inverter assembly.

Photo 3

Photo 4 (Inverter assembly)

Photo5

3. Removing R.V. coil

(1) Remove the cabinet and panels. (Refer to 1.)
(2) Disconnect the following connectors:

CN721 (R.V. coil) (MUZ)

(3) Remove the R.V. coil. (Photo 5)

Welded parts of 4-way valve

R.V. coil (MUZ)

Screws of the
relay panel

Screws of
the reactor

Heat sink

T.B.support

Hook of the

PB support

PB support

Hook of the

PB support

Relay panel

Screw of the

PB fixture

Screw of the

T.B.support

Inverter P.C.

board

Screw of the

ground wire

This manual is related to the following products: