beautypg.com

Gateway E-9722R User Manual

Page 54

background image

CHAPTER 4: Installing Components

48

To install an optional mezzanine board:

1

Follow the instructions in

“Preventing static electricity discharge” on page 24

. Make sure

that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.

2

Follow the instructions in

“Opening the server case” on page 25

.

3

Remove the PCI riser assembly by following the instructions in

“Installing and removing

PCI expansion cards” on page 34

.

4

Align the holes on one side of the mezzanine board with the plastic standoffs and align
the other side with the mezzanine board slots (1).

5

Push down on the card (2) to seat it in the mezzanine board slot and onto the plastic
standoffs until the retaining tabs snap into place.

6

Replace the PCI riser card assembly by following the instructions in

“Installing and removing

PCI expansion cards” on page 34.

7

Follow the instructions in

“Closing the server case” on page 27

.

To remove an optional mezzanine board:

1

Follow the instructions in

“Preventing static electricity discharge” on page 24

. Make sure

that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.

2

Follow the instructions in

“Opening the server case” on page 25

.

3

Remove the PCI riser assembly by following the instructions in

“Installing and removing

PCI expansion cards” on page 34

.

4

Push aside the plastic retaining tabs (1) and pull the mezzanine board (2) out of the
mezzanine board slot.

5

Replace the PCI riser card assembly by following the instructions in

“Installing and removing

PCI expansion cards” on page 34.

6

Follow the instructions in

“Closing the server case” on page 27

.