Gateway E-9722R User Manual
Page 54

CHAPTER 4: Installing Components
48
To install an optional mezzanine board:
1
Follow the instructions in
“Preventing static electricity discharge” on page 24
. Make sure
that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.
2
Follow the instructions in
“Opening the server case” on page 25
.
3
Remove the PCI riser assembly by following the instructions in
PCI expansion cards” on page 34
.
4
Align the holes on one side of the mezzanine board with the plastic standoffs and align
the other side with the mezzanine board slots (1).
5
Push down on the card (2) to seat it in the mezzanine board slot and onto the plastic
standoffs until the retaining tabs snap into place.
6
Replace the PCI riser card assembly by following the instructions in
PCI expansion cards” on page 34.
7
Follow the instructions in
“Closing the server case” on page 27
To remove an optional mezzanine board:
1
Follow the instructions in
“Preventing static electricity discharge” on page 24
. Make sure
that you turn off the server, then unplug the power cord(s) and all other cables connected
to the server.
2
Follow the instructions in
“Opening the server case” on page 25
.
3
Remove the PCI riser assembly by following the instructions in
PCI expansion cards” on page 34
.
4
Push aside the plastic retaining tabs (1) and pull the mezzanine board (2) out of the
mezzanine board slot.
5
Replace the PCI riser card assembly by following the instructions in
PCI expansion cards” on page 34.
6
Follow the instructions in