Caution, Shipping tape location, Shipping screw location – Friedrich 920-087-09 (12/10) User Manual
Page 17: Removing front panel, Unit damage hazard

17
FRP020
SHIPPING
TAPE
Figure 20
Shipping Tape Location
FRP021
REMOVE SHIPPING
SCREW IF PRESENT
Figure 21
Shipping Screw Location
Figure 22
Removing Front Panel
CAUTION
Unit Damage Hazard
Failure to follow this caution may result in equipment damage
or improper operation.
Failure to remove shipping tape and screw will prevent fresh
air vent door from opening and may result in damage to vent
door cable.
3.. Carefully.remove.shipping.tape.from.the.front.panel.and.vent.door...
See.Figure.20
4. Remove.shipping.screw.from.the.vent.door,.if.present..See.Fig.21..
5.. Remove.front.panel..See.Figure.22.
Pull.out.at.the.bottom.to.release.it.from.the.tabs.(1)...Then.lift.up.(2).
NOTE:.
If.the.unit.is.mounted.flush.to.the.floor,.the.service.cord.MUST.
be.rerouted.at.the.bottom.of.the.front.cover.on.the.side.closest.
to.the.receptacle...A.notch.MUST.be.made.in.the.front.cover.
side.where.the.cord.exits.the.unit...It.is.the.responsibility.of.
the.installer.to.create.an.exit.notch..
FRP022
2
1
- 7,200 BTU Packaged Terminal Air Conditioner Warranty 7,200 BTU Packaged Terminal Air Conditioner Installation and Operation Manual ZoneAire Series 42 Inch Packaged Terminal Air Conditioner Warranty A-SERIES 24,000 BTU/h 9 HEAT PUMPS 7,200 BTU Packaged Terminal Air Conditioner Product Profile ZoneAire Series 42 Inch Packaged Terminal Air Conditioner Warranty Guide ZoneAire Series 42 Inch Packaged Terminal Air Conditioner Installation Guide ZoneAire Series Electric Heat Packed Terminal Air Conditioner Installation Manual ZoneAire Series 14,500 BTU Smart Packaged Terminal Air Conditioner Installation Guide 12,000 BTU FreshAire® Package Terminal Air Conditioner Installation Manual