beautypg.com

6 mounting with pivoting element, Installation tips, 5 post-installation check – Lightning Audio 7532 User Manual

Page 24: Post-installation check

background image

Mounting

Radar Tank Gauge

24

Installation and Operations Manual

3.4.6

Mounting with Pivoting element

Installation tips

The Pivoting element serves to swivel the 7500 RTG from the measuring position, e.g.

to clean the antenna or dip the tank.

The pivoting element is not part of the standard offering from Varec, special offers

available under ref. number MVTFM0422.

3.5

Post-installation check

After the measuring instrument has been installed, perform the following checks:
• Is the measuring instrument damaged (visual check)?
• Does the measuring instrument correspond to the measuring point specifications

such as process temperature/pressure, ambient temperature, measuring range, etc.?

• Is the flange marking correctly aligned? (see page 11)
• Have the flange screws been tightened up with the respective tightening torque?
• Are the measuring point number and labeling correct (visual check)?
• Is the measuring instrument adequately protected against rain and direct sunlight

(see page 75)?

L00

-FMR

53

xxx-17-0

0-00

-e

n-01

3