Warning, H. vertical termination, Step 2. s – Heat & Glo Fireplace VRT-BZ-P-AUB User Manual

Page 34

background image

Heat & Glo • VRT-AUB • 2123-980 Rev. J • 2/13

34

STORM COLLAR

VERTICAL

TERMINATION CAP

PIPE LENGTH

FIRESTOP

FLASHING

SUPPORT

BOX

11.58 m

(38 ft.)

MAXIMUM

On vertical terminations use SLP-TVHW.

Figure 7.20

Step 1.

Check the installation instructions for required 10 in. (254

mm) clearances (air space) to combustibles when pass-

ing through ceilings, walls, roofs, enclosures, attic rafters,

or other nearby combustible surfaces. (See

Figure 7.19).

Check the instructions for maximum vertical rise of the

flueing system, and any maximum horizontal offset limita-

tions. All offsets must fall within the set parameters of the

flueing diagrams located in Section 7.
NOTE: Maximum vertical rise allowable is 38 ft. (11.58 m)

Figure 7.20.

CONNECTED TO

WALL STRAP

WALL

STRAP

TWO 45 DEGREE

ELBOWS

METAL STRAP

Step 2.

S

et the gas stove in its desired location. Drop a plumb

bob down from the ceiling to the position of the gas stove

flue exit, and mark the location where the flue will pen-

etrate the ceiling. Drill a small hole at this point. Next, drop

a plumb bob from the roof to the hole previously drilled

in the ceiling, and mark the spot where the flue will pen-

etrate the roof. Determine if ceiling joists, roof rafters, or

other framing will obstruct the flueing system. You may

wish to relocate the gas stove, or to offset, as shown in

Figure 7.21 to avoid cutting load bearing members.

Figure 7.21

Figure 7.19

H. Vertical Termination

Fire Risk.
Explosion Risk.
Maintain flue clearance to combustibles as

specified.
• Do not pack air space with insulation or other

materials.

Failure to keep insulation or other materials

away from flue pipe may cause fire.

WARNING