beautypg.com

Step 2 framing the fireplace – Heat & Glo Fireplace Heat-N-Glo 6000XLT-CDN User Manual

Page 9

background image

9

A

B

C

Framing should be

constructed of 2 X 4

lumber or heavier.

Model

A

B

C

D

E

6000TR

42

38 1/4

22

42

26 1/4

6000XLS

42

38 1/4

22

N/A

26 1/4

6000XLT-CDN 42

38 1/4

22

42

N/A

6000ARCH

42*

41 7/8

22

53 5/8

N/A

48 1/4**

* SURROUND IN FRONT OF FINISHED WALL

** SURROUND FLUSH WITH FINISHED WALL

NOTE: DIMENSIONS SHOWN IN INCHES

D

E

SHOWS CENTER OF12" X 12"

VENT FRAMING HOLES FOR

TOP & REAR VENTING.

Figure 4. Framing Dimensions

Minimum Clearances from the Vent Pipe to

Combustible Materials

For Vertical

For Horizontal Sections

Sections

At Wall Firestops

Top

Bottom

Sides

Top

Bottom

Sides

3 inches

1 inch

1 inch

1 inch

2-1/2 inches 1/2 inch

1 inch

(75 mm) (25 mm) (25 mm)

(25 mm)

(63.7 mm) (13 mm) (25 mm)

For minimum clearances, see the direct vent

termination clearance diagrams on pages 28 and 30 in

this manual.

Step 2

Framing the

Fireplace

Fireplace framing can be built before or after the

fireplace is set in place. Framing should be positioned

to accommodate wall coverings and fireplace facing

material. The diagram below shows framing reference

dimensions.

CAUTION

MEASURE FIREPLACE DIMENSIONS, AND

VERIFY FRAMING METHODS AND WALL

COVERING DETAILS, BEFORE FRAMING

CONSTRUCTION BEGINS.

This manual is related to the following products: