Heat & Glo Fireplace Heat-N-Glo 6000XLT-CDN User Manual

Page 26

background image

26

JOIST

CEILING FIRESTOP

CEILING

NAILS (4 REQUIRED)

!

If the area above the ceiling IS an attic, position and

secure the firestop on top of the previously framed

hole.

This shows an attic

installation.
1. Keep insulation away

from the vent pipe at

least 1 inch (25 mm).

Figure 24. Attic Firestop

C. Vent Termination

For Horizontal Terminations - To attach and secure

the termination to the last section of horizontal vent:
• Rotate and interlock the ends as described at the

beginning of the Installing Vent Components

section.

• The termination kit should pass through the wall

firestops from the exterior of the building.

• Adjust the termination cap to its final exterior

position on the building.

WARNING

THE TERMINATION CAP MUST BE

POSITIONED SO THAT THE ARROW IS

POINTING UP.

For roundcap termination kits:
• Use the exterior pipelock hole provided on the

round flange of the wall firestop to secure the vent

pipe in place.

For trapezoidal cap termination kits:
• Using screws, secure the cap to the exterior wall

through the flanges built into the cap.