POWER UP CHECKLIST

Ensure batteries are disconnected.

Turn mains switch to "on"

The "mains on" led should light.

Allow 15 seconds for the panel to perform its start up tests.

Connect batteries

FUNCTIONAL TESTING

Primary ac supply voltage: 200 or 220 or 240vac +10% as required

Charger output voltage without batteries: 27.3v dc

Keypad functional

Perform auto test

Led’s all functional

LCD backlighting functional

Liquid crystal display functional

Zone fault detection

Zone alarm detection

Internal sounder operating

MCP loop wired to zone number ______ (if applicable)

Test auxiliary power output

Test bell output

Test warning system output

Test ACF output

Test door holder output (optional)

Test bell output supervision

Test warning system output supervision

Test ACF output supervision

Test brigade alarm relay #1

Test brigade alarm relay #2

Test standby relay (normally energised)

Test fault relay (normally energised)

Test mains fail relay

Test isolate relay

Test general alarm relays (2)

Test relay boards (if fitted)

Test open collector output boards (if fitted)

Press "battery test" once

If batteries are flat, allow 24hrs to charge and then re-test.