PLACING INTO OPERATION
Suitably qualified technicians must install the panel. The following check procedures are recommended after
every installation and prior to initial power-up.
A thorough visual inspection should be made to every aspect of the fire panel. This includes loose wire, metal
filings, loose circuit boards, loose cabling, damage in transit etc.
All problems must be rectified immediately as they could cause incorrect operation or permanent damage to
the equipment.
EQUIPMENT AS FITTED
QTY
Description
Code
1
MAIN CONTROL BOARD
IFS -2004
1
MAIN TERMINATION BOARD
IFS -2005
1
MAIN POWER SUPPLY
IFS -2006
8 ZONE EXPANSION BOARD
IFS -804
16 ZONE INDICATOR BOARD
IFS -816
ADD ON, 8 WAY RELAY BOARD
IFS-717
EXTERNAL POWER SUPPLY BOOSTER
PS244, PS249, NPS-3,
NPS-5, NPS-11
3A DOOR HOLDER P/SUPPLY TRANSFORMER
2600/DHTX
INITIAL CHECKLIST
System general appearance good
Cabinet colour and condition good
Cabinet keyed 003
All circuit boards firmly fastened
Manual call point fitted & functional
Viewing window clear and firmly secured
Cable entries adequately sealed
240VAC mains cabling is correctly terminated
All earthing secured
Transformer securely mounted
Transformer correctly wired
All ribbon cables firmly secured
All operational zones adequately identified
All fuses correct value and fitted properly
All other modules securely fitted
Manufacturing label affixed
You are now ready to power up the IFS-2600 Fire Indicator Panel.