Figure 6‐10 – Enterasys Networks 7S4280-19-SYS User Manual
Page 77

The NAC Controller Initialization Procedure
Enterasys NAC Controller Hardware Installation Guide 6-9
Figure 6-10 Setup NAC Controller Engine Networking for In-Band Installation Types
For Out‐Of‐Band management, as displayed in
, enter the host name, management
IP address/netmask (10/100 Ethernet interface), and remediation IP address/netmask, and
click on Accept to proceed. The NAC Controller Engine management IP address must be on
the same subnet as the NAC Controller PEP IP address. The NAC Controller Engine
remediation IP address must belong to a subnet different from the NAC Controller
management IP address.
This manual is related to the following products: