2 rack mounting – PLANET WGSW-20160HP User Manual
Page 40
![background image](https://www.manualsdir.com/files/865161/content/doc040.png)
User’s Manual of WGSW-20160HP/WGSW-24040HP series
40
Connection to the Managed Switch requires UTP Category 5 network cabling with RJ-45 tips. For more
information, please see the Cabling Specification in Appendix A.
Step5:
Supply power to the Managed Switch.
Connect one end of the power cable to the Managed Switch.
Connect the power plug of the power cable to a standard wall outlet.
When the Managed Switch receives power, the Power LED should remain solid Green.
2.2.2 Rack Mounting
To install the Managed Switch in a 19-inch standard rack, please follow the instructions described below.
Step1:
Place the Managed Switch on a hard flat surface, with the front panel positioned towards the front side.
Step2:
Attach the rack-mount bracket to each side of the Managed Switch with supplied screws attached to the package.
Figure 2-5
shows how to attach brackets to one side of the Managed Switch.
Figure 2-5: Attach Brackets to the Managed Switch.
You must use the screws supplied with the mounting brackets. Damage caused to the parts by
using incorrect screws would invalidate the warranty.
Step3:
Secure the brackets tightly.
Step4:
Follow the same steps to attach the second bracket to the opposite side.
Step5:
After the brackets are attached to the Managed Switch, use suitable screws to securely attach the brackets to the rack
,
as shown in
Figure 2-6
.