MCZ Vivo 80 Pellet HYDRO User Manual
Page 68
66
10-MAINTENANCE AND CLEANING
END-OF-SEASON SHUTDOWN
At the end of each season, before switching the product off, it is recommended to remove all the pellets from the hopper with a vacuum
cleaner that has a long pipe.
The product must be disconnected from the mains when it is not used.
CHECKING THE INTERNAL COMPONENTS
ATTENTION!
The internal electromechanical components must only be checked by qualified personnel whose technical expertise
includes combustion and electricity.
It is recommended to perform this routine maintenance annually (with a scheduled service contract), which focuses on a visual and
functional verification of the internal components. The following is a summary of the necessary checks and/or maintenance for the
product to work correctly.
PARTS/INTERVAL
1 DAY
2-3 DAYS 7 DAYS
30 DAYS
60-90 DAYS
1 YEAR
Brazier
·
Ash pan
·
Glass
·
Lower compartment
·
Complete exchanger
·
Smoke duct
·
Door gasket
·
Internal parts
·
Product
·
Circulation pump
·
Plate heat exchanger
·
Plumbing components
·
Electromechanical components
·