4-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

ELECTRICAL CONNECTION

First connect the power cable to the rear part of the product and then to a wall socket, which must always be accessible.

Should this not be possible, during installation, insert appropriate power supply disconnection devices, in compliance with the national

regulations regarding electrical installations.

It is recommended to disconnect the power cable when the product is not used.

SETTING UP THE CLADDING

The product must be fully tested before the cladding is applied. The company cannot be held liable for any damage to the

cladding should operating anomalies arise, which were not verified before the cladding was applied to the product.

IT IS MANDATORY to check the tightness of all the pipes through which smoke passes (smoke fitting, gaskets and flue coupling)

before setting up the cladding.

READ THE "OPERATION TEST" CHAPTER BEFORE STARTING ANY PRODUCT CLADDING OPERATION.

The product and the cladding parts must be fastened together WITHOUT COMING INTO CONTACT WITH THE STEEL STRUCTURE in

order to prevent heat from being transmitted to the marble and/or stone and to allow for normal thermal expansion. Pay attention to the

wood finishes, such as beams or shelves.

It is recommended to set up the counter hood made of 15 to 20 mm thick fireproof plasterboard with a freestanding frame made of a

galvanised profile to prevent bearing the weight on the cladding components (wooden beams or marble lintels), which do not have a

freestanding structure and in order to intervene easily in case of anomalies and/or future maintenance. Dry mount the hearth

of the cladding, leaving a 1 cm gap between the insert and the hearth for insulation.