beautypg.com

Installation and assembly – MCZ Vivo 80 Pellet HYDRO User Manual

Page 28

background image

26

4-INSTALLATION AND ASSEMBLY

WOODEN BEAM INSULATION

If you wish to mount a wooden beam, it must be protected with adequate insulation from the hot parts in order to prevent the risk of fire

or damage to the cladding.

STANDARD CLADDING ASSEMBLY

The installation guide found in each specific cladding must be referred to for the assembly of MCZ product specific claddings.

FRAME ASSEMBLY

Once the cladding and/or the plasterboard wall is set up, fit the frame.

This frame is meant for finishing and covering the gap between the metal structure of the product and the cladding.

The four screws for fixing the frame are already screwed to the lateral columns. Simply open the door of the product, insert the frame as

shown in the figure, loosen the screws fixed to the columns and tighten them fastening the frame to the structure.

1 - INSULATION APPLIED OR TO BE APPLIED

2 - WOODEN BEAM

3 - MARBLE OR OTHER MATERIAL

FRAME

SCREWS

LATERAL COLUMNS