1 checking the power-up diagnostics sequence – Enterasys Networks Fast Network 10 User Manual
Page 36

Chapter 2: Unpacking and Installing Your FN10
Page 2-6
Fast Network 10 User Guide
2. Place the FN10 chassis in the cabinet.
3. Secure the FN10 with the rack-mount fasteners by inserting and
securing a fastener through each of the four slots in the rack-mount
brackets, as shown in Figure 2-4.
Figure 2-4
Rack-mounting the FN10
4. Once the FN10 is installed, plug the AC power cord into the AC power
connector on the rear of the FN10 chassis. Plug the other end of the
power cord into a three-prong grounded outlet.
2.2.1 Checking the Power-up Diagnostics Sequence
Before connecting any devices to the FN10, power on the unit and
observe the power-up diagnostics sequence to check for proper operation.
To observe the power-up diagnostics sequence completely, you may want
to repeat it. To restart the power-up sequence, turn the power switch
OFF
,
then
ON
again, or press the reset button on the front panel.
When you power up the FN10, the following occurs:
1. All LEDs, except for the Port Link LEDs, turn on for one second.
2. The Power (Pwr) LED remains on.
3. The Ready LED starts flashing.
4. After several seconds, the Port Link LEDs turn on briefly.
Fasteners
Rack
Fasteners