4 startup, Startup – SMA SB 700 User Manual
Page 30
Installation
SMA
Technologie AG
Page 30
SB700-11:SA2006
Installation Guide
5.4 Startup
You can start up the Sunny Boy 700 when
• the lid is securely screwed on the enclosure,
• the AC (mains) cable is connected correctly,
• the DC cables (PV strings) are fully connected and the unused DC plug connectors
on the bottom of the enclosure are closed using the protective caps.
How to start up the inverter
Check the string voltages again to make sure they are within the limits stated in
section 4.2 "PV generator requirements" (page 15). If the string voltages are too
high, the PV generator's planner / installer should be called upon for assistance.
If despite checking the string voltages the LED signal occurs again when the PV
generator is connected to the Sunny Boy 700, disconnect the PV generator from the
Sunny Boy again and contact SMA Technologie AG (see section 10 "Contact"
(page 49)).
1.
First of all, switch the line circuit breaker to the
"on" position.
2.
Check whether the LEDs indicate trouble-free
operation of the Sunny Boy 700 based on the
table on the next page. In that case, startup has
been successfully completed.
If the bottom yellow LED flashes four times at intervals of one
second, the grid voltage and the PV generator must be
disconnected from the Sunny Boy 700 immediately! There is a risk
of damage to the inverter resulting from excessive DC input
voltage.
On!
Off
Betrieb
Operation
Erdschluss
Earth Fault
Störung
Failure
Photovoltaik-Stringwechselrichter
Photovoltaic string inverter