beautypg.com

4 battery management and charge control, 1 sma operation, Battery management and charge control – SMA SIC 50 User Manual

Page 12: Sma operation

background image

Battery Management and Charge Control

SMA Solar Technology AG

12

SIC50-IA-en-11

Installation Guide

4 Battery Management and Charge Control

4.1 SMA Operation

The SIC-PB communication interface must be installed and connected to the Sunny Island 5048/
2012/2224 for SMA operation. If a communication connection is established, the Sunny Island will
control of battery management, including charge control.
The charge controller receives the current and temperature-compensated nominal charging voltage
from the Sunny Island and transmits the battery's present charging current back to the Sunny Island.
This ensures that the battery is always optimally charged and that the Sunny Island calculates the
correct charging state. For further details on battery management see the Sunny Island
documentation.
If communication does not function in SMA operation, the battery will only be charged with voltages
of 13.5/27/54 V.

Working principle of a Sunny Island system with a charge controller

Battery

Charge controller

Sync bus (CAN)

Array

Sunny Boy

Sunny Island