SMA STP 15000TL User Manual
Page 33

9.
Damage to the inverter due to moisture ingress
The inverter is only properly sealed when all unused DC inputs are closed with DC connectors
and sealing plugs.
• Do not insert the sealing plugs directly into the DC inputs on the inverter.
• For unused DC connectors, push down the
clamping bracket and push the swivel nut
up to the thread.
• Insert the sealing plug into the DC
connector.
• Tighten the DC connector (torque: 2 Nm).
• Insert the DC connectors with sealing plugs
into the corresponding DC inputs on the
inverter.
☑ The DC connectors snap into place.
10. Remove the ESS.
☑ The display switches off.
6 Electrical Connection
SMA Solar Technology AG
Operating Manual
33
STP15-17TL-10-BE-en-10
This manual is related to the following products: