beautypg.com

ShoreLand'r 2x4W User Manual

Page 50

background image

Rocker Boxes:

Align the center hole of the 6239210, rocker arm, with the

center hole of the spring bracket. Secure with a 3/4” X 4-1/

2” hex bolt, from the outside-in, and 3/4” hex lock nut with

the grease zerk down.

Axles:

Fasten the springs to the axles with the axle u-bolts, spring

plate and hex lock nuts. NOTE: Make certain the hook end

of the springs point in the same direction to the rear of the

trailer, on both axles! For the rear spring and axle place a

S-3207 galvanized spring bracket bushing in the rear of

the spring bracket. Insert a 9/16” X 3-1/4” hex bolt through

the bracket from the outside-in and tighten with a 9/16” hex

lock nut. Slide the end of the hook spring over the bushing;

raise the front of the spring and fasten with a 9/16” X 3-1/4”

hex bolt and 9/16” hex lock nut.

For installation of the front spring and axle repeat the

above instructions, however, place the bushing in the

rocker box in hook end of the spring. Insert bolts and

secure with lock nuts as before.

Mount the tire and rim assemblies using 80-90 ft. lbs.

torque on the lug nuts.

Brakes:

Refer to the brake manual for service and maintenance.

Tire Size & Carrying Capacity Chart

Tire

Load

Carrying

Size Range

Capacity

ST175/80R13

C

1360 lbs. per/tire

Refer to the tire side wall for the correct tire pressure.