4 t est run – HEIDENHAIN TNC 620 (340 56x-03) User Manual
Page 451

HEIDENHAIN TNC 620
451
15.4 T
est Run
Executing a test run
If the central tool file is active, a tool table must be active (status S) to
conduct a test run. Select a tool table via the file manager (PGM MGT)
in the Test Run mode of operation.
With the BLANK IN WORK SPACE function, you activate work space
monitoring for the test run, see "Showing the Workpiece Blank in the
Working Space (Advanced Graphic Features Software Option)", page
447.
U
Select the Test Run operating mode
U
Call the file manager with the PGM MGT key and
select the file you wish to test, or
U
Go to the program beginning: Select line 0 with the
GOTO key and confirm your entry with the ENT key
The TNC then displays the following soft keys:
You can interrupt the test run and continue it again at any point—even
within a fixed cycle. In order to continue the test, the following actions
must not be performed:
Selecting another block with the arrow keys or the GOTO key
Making changes to the program
Switching the operating mode
Selecting a new program
Functions
Soft key
Reset the blank form and test the entire program
Test the entire program
Test each program block individually
Halt test run (soft key only appears once you have
started the test run)