Powering on the firewall, Checking before power-on – H3C Technologies H3C SecPath F5000-S Firewall User Manual
Page 37

28
Figure 26 Setting terminal emulation in test Properties dialog box
Powering on the firewall
Checking before power-on
WARNING!
Locate the emergency power-off switch in the room before power-on so you can quickly shut power off
when an electrical accident occurs.
Before powering on the firewall, verify that:
•
The power cord and grounding cable are properly connected.
•
The input power voltage is as required.
•
The console cable is properly connected, the terminal or PC used for configuration has started, and
the configuration parameters have been correctly set.
•
The interface card (if any) is correctly installed.
Powering on the firewall
1.
Switch on the power source of the firewall.
2.
Switch on the AC or DC power module.