ELECTRICAL SAFETY TESTER

USER MANUAL



15

19 SOURCE+ Terminal

(only for Ground
Bond Test)

High current terminal for Ground Bond test.

20 Power Switch

Press the power switch to turn on the tester.

21 SENSE+ Terminal

Voltage Terminal for Ground Bond test.

22 SENSE- & Return

Terminal

SENSE- Terminal is a voltage terminal for
Ground Bond test, and Return Terminal is for all
test.

23 Ground Terminal

Connect Ground terminal to the earth ground.

24 Fuse Holder with

Voltage Selector

To change AC source voltage, pull the fuse holder
and rotate it to the proper value.

25 AC Inlet

Connect the AC power line to the inlet.

26 Remote Interface

The remote interface performs all the functions of
PLC control.

27 RS232 Terminal

D-SUB 9 pin connector, Input/Output connector
for RS232.

28 GPIB Terminal

Blue 24 connector, Input/Output connector for
IEE-488.

29 Scanner Interface

D-sub 9 pins female connector for scanner box.

30 High Voltage Output

on rear panel

High voltage output terminal.

31 Sense + Terminal on

rear panel

Voltage terminal for Ground Bond test.

32 Source + Terminal

on rear panel

High current terminal for Ground Bond test.

33 Source - Terminal

on rear panel

High current terminal for Ground Bond test.

34 Sense - Terminal &

Return Terminal on
rear panel

Sense - terminal is a voltage terminal for Ground
Bond test, Return terminal is for all tests.

*The instrument can be used together with scanner box of SHB-001-1 &

SHB-001-2.

*The Instrument can control one scanner box only.


ELECTRICAL SAFETY TESTER

USER MANUAL



16

5. OPERATION METHOD

5-1. Main Display LCD

1 ~ 0 1 A C W

V = 5 .

0

0

0 k V

R E A D Y

I m a x = 0 1 . 0 0 m A

T E S T

0 0 0 . 0 s


Table of parameters

Storage

Group/ Step: There are total 10 groups, and each group has 16

steps.

The first number represents group while the second number
represents step.

Ex. 3:1

3 is for group number, 1 is for step number.

The test mode of tester includes:

ACW: AC Withstanding voltage test.

DCW: DC Withstanding voltage test (only for GPT-715A/

GPI-735A/745A).

I R : Insulation Resistance test (only for GPI-725A/GPI-735A

/745A).

G B : Ground Bond test (only for GPI-745A).

C N T : Continuity Check test (only for GPT-705A/715A/

GPI-725A/735A)

Mode

The total types of mode will change for different model.

Storage Mode Output Voltage/Current ARC Status

Measurement Limit

Ramp/Test Time