Seaward 250 PrimeTest User Manual
Page 36

PrimeTest 250+
Operating Instructions
34
• Otherwise, the PrimeTest 250+ will proceed
with
the
R
PE
measurement, reverse the test
current and then repeat the measurement. The
highest measured value that occurred during
the two tests is displayed for approximately 2s.
Note: There is no factory programmed test
limit for the 3 phase R
PE
measurement
and so no tick or cross is displayed.
•
The PrimeTest 250+ will then display the current
fl owing in the protective conductor of the 3
phase
supply.
• The 3-Phase leakage test will run for 30
seconds but can be stopped earlier by pressing
the 3-Phase button.
Note: If the 3-Phase key is pressed while no
adaptor is connected to the PrimeTest
250+ then a warning message PLUG IN
3 PH ADPTR will be displayed.
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)