beautypg.com

Seaward 250 PrimeTest User Manual

Page 20

background image

PrimeTest 250+

Operating Instructions

18

Power ON/OFF = press and hold CLI and CLII
simultaneously

Class I appliance test = press the CLI key

Class II appliance test = press the CLII key

Cord / extension lead test = press the CLI key

Enter Setup Mode = press the SETUP key
Once in the setup mode the CLII button can be
used to the change the Insulation voltage while
the LKGE button can be used to change the ILEAK
pass/fail limit. To leave the setup mode press the
SETUP button.

30mA RCD test = press the 30mA RCD key

3 phase appliance test = press the 3 phase key

Note: The PrimeTest 250+ will automatically
switch OFF after approximately 1 minute if no
keys are pressed.

Note: When a key is pressed to initiate a test
sequence, the PrimeTest 250+ will compare
the type of appliance connected with the test
sequence that has been selected, and where
possible, will prompt the user if an inappropriate
test has been selected.

For example, if an IEC lead is connected between
the front panel mains socket and the IEC socket
on the end panel and a CLI appliance test is
selected, the PrimeTest 250+ will fl ash the Cord
test enunciator to indicate that the Cord test is
the most appropriate test.