Seaward 250 PrimeTest User Manual
Page 27

PrimeTest 250+
Operating Instructions
25
Note:
The power switch on the appliance
under test must be in the ON position
to perform an insulation test. If no
appliance is detected the PrimeTest
250+ will display the following.
3.3 Testing a Class II Appliance
•
Visually inspect the appliance and mains cord
for signs of damage.
• If the appliance passes a visual inspection
proceed with the electrical tests.
•
Plug the earth test lead into the Earth Continuity
Test Terminal on the PrimeTest 250+ end panel.
• Plug the appliance into the PrimeTest 250+
front panel test/mains outlet socket.
• Connect the earth test probe to an exposed
metal part on the appliance.
• If the Appliance under test has an ON/OFF
switch, make sure it is in the ON position.
•
Press the CLII test key.
•
The display will momentarily show the insulation
test voltage before proceeding with the test.
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)