beautypg.com

Seaward 250 PrimeTest User Manual

Page 25

background image

If a differential leakage test is performed then

the test PrimeTest 250+ will prompt the user to

start the Leakage test by fl ashing the Ileak

icon. If no key is pressed the PrimeTest 250+

will timeout and return to the start screen.

Note: If the LKGE key is pressed momentarily

the differential test duration is 5s.

If the LKGE key is pressed and held for

2s the differential test duration is

2

minutes.

When the duration is set to 2 minutes,

the test can be terminated at any time

by pressing the LKGE key.

• When the LKGE key is pressed to start the

differential leakage test the PrimeTest 250+ will

check the incoming mains supply to ensure

that the voltages are correct. The enunciators

are displayed if there is an error with the

connected mains supply:

If the mains voltage is correct, the PrimeTest 250+

will proceed with the differential leakage test.

PrimeTest 250+

Operating Instructions

23

Mains status

No mains

Earth fault or Live
and Neutral reverse

LN

LE

NE

Flash

Flash

OFF

OFF

Flash

Flash