Seaward 250 PrimeTest User Manual
Page 32

PrimeTest 250+
Operating Instructions
30
3.6 Changing the Insulation Test Voltage
The Insulation test performed in the CLI and CLII test
sequences can be changed to 250V for appliances
with MOVs which would fail an Insulation test
performed at 500V.
In order to change the Insulation voltage press the
SETUP button to enter setup mode. Once in setup
mode press the CLII button, the selected insulation
voltage will be displayed next to the Riso enunciator.
To leave setup mode press the SETUP button.
3.7 Changing the CLI Leakage limit
The CLI Leakage pass/fail limit can be changed
between 0.75mA and 3.5mA.
In order to change the Leakage limit press the
SETUP button to enter setup mode. Once in setup
mode press the LKGE button, the selected pass/fail
limit will be displayed next to the Ileak enunciator.
To leave setup mode press the SETUP button.
- AGL-5 (2 pages)
- Apollo 500 (21 pages)
- B433R (16 pages)
- Checkbox 17 Plus (4 pages)
- Apollo 600 (32 pages)
- B255 (40 pages)
- A203ES (10 pages)
- A252 (35 pages)
- DO4000 (22 pages)
- DO5000 Interface (41 pages)
- DO5000 Series (36 pages)
- DO7e (24 pages)
- DP6 (22 pages)
- DO7010 (44 pages)
- ARE 1557 (31 pages)
- Europa Pac Plus (53 pages)
- Supernova Elite (118 pages)
- HAL Scan (164 pages)
- G2000 (44 pages)
- IRT 1557 (21 pages)
- KD1E (22 pages)
- LLT (2 pages)
- PAC3760 (2 pages)
- PAC 1500Xi (12 pages)
- PAC 1000 (10 pages)
- PAT2000i (29 pages)
- PATGuard Elite Quick start (2 pages)
- PATGuard Elite SQL Quick start (2 pages)
- PATGuard Pro 2 (77 pages)
- PATguard Pro 2 Quick start (2 pages)
- PATGuard Time Manager (12 pages)
- PATGuard Work About Quick start (4 pages)
- PH3 LLT (6 pages)
- PATGuard Work About (53 pages)
- Solar Power Clamp (31 pages)
- PowerGuard Pro (29 pages)
- PowerPlus 1557 (62 pages)
- PowerPlus PC (44 pages)
- 100 PrimeTest (24 pages)
- PATGuard 3 (153 pages)
- 200 PrimeTest (34 pages)
- 220 PrimeTest (34 pages)
- 50 PrimeTest (20 pages)
- RH9A Series (16 pages)