beautypg.com

For the installer: remote condenser – Scotsman NME654R User Manual

Page 6

background image

FOR THE INSTALLER: Remote Condenser

Location

Limited to a 40 foot or a 25 foot length of

precharged refrigerant tubing connecting the ice

machine to the remote condenser. The condenser

must be above or level with the ice machine.

Select the best available location, protecting the

condenser from extremes of dirt, dust, and sun.

Meet all applicable building codes. Usually the

services of a licensed electrician are required.

Roof Attachment

1. Install and attach the remote condenser to the

roof of the building, using the methods and

practices of construction that conform to the local

building codes, including having a roofing

contractor secure the condenser to the roof.

2. Have an electrician connect the remote

condenser fan motor to the ice machine, using the

junction box at the back of the ice machine.

PRECHARGED LINE ROUTING

CAUTION

Do not connect precharged tubing until all routing

and forming of the tubing is complete. See the

coupling instructions for connecting information.

1. Each set of precharged refrigerant lines (either

25 foot or 40 foot) consists of a 3/8 inch diameter

liquid line and a 1/2 inch diameter discharge line.

Both ends of each line have quick connect

couplings, one end has a schrader valve

connection, that end goes to the condenser.

Note: The openings in the building ceiling or wall,

listed in the next step, are the minimum sizes

recommended for passing the refrigerant lines

through.

2. Have the roofing contractor cut a minimum hole

for the refrigerant lines of 1 3/4 inch. Check local

codes, a separate hole may be required for the

electrical power to the condenser.

CAUTION

DO NOT KINK OR CRIMP REFRIGERANT

TUBING WHEN INSTALLING IT.

3. Route the refrigerant lines through the roof

opening.

Follow straight line routing whenever possible.

Any excess tubing MUST be retained within the

building.

4. Spiral the excess length of pre charged tubing

inside the building. Use a horizontal spiral (need

not be as tight as illustrated) to avoid any traps in

the lines.

5. Have the roofing contractor seal the holes in the

roof per local codes.

CAUTION

The couplings on the sets of precharged lines are

self sealing when installed properly. Carefully

follow the instructions:

NME654R & FME804R

January 2000

Page 6

REMOTE CONDENSER

LOCATE REMOTE

CONDENSER ABOVE

ICEMAKER

SPIRAL

EXCESS

TUBING

INSIDE

BUILDING