For the installer: final check list – Scotsman NME654R User Manual
Page 12
FOR THE INSTALLER: Final Check List
1. Is the ice system installed
indoors in a location where the air
and water temperatures are
controlled, and where they do not
exceed the design limitations?
2. Is there an electrical service
disconnect within sight of the
installed machine? Has the
voltage been checked, and
compared to nameplate
requirements?
3. Have all the plumbing
connections been made and
checked for leaks?
4. Has the machine and bin been
leveled?
5. Is there a minimum of 6"
clearance at the rear, left, and
right of the machine for proper
service access and air
circulation?
6. Is the water pressure a
minimum of 20 PSI?
7. Has the machine been secured
to the bin?
8. If two units on one condenser,
has the relay kit been installed?
9. Is there a water shut off valve
installed near the machine?
10. Is the remote condenser
installed per local building codes,
and in a place where it has
adequate ventilation and minimal
solar heat gain?
11. Has all shipping material and
literature (inside the front panel)
been removed from the units?
12. Have the remote condenser
and precharged lines been
properly installed?
13. Has the electrical connection
between the icemaker and the
condenser been made?
14. Verify that the master switch
is in the OFF position.
15. Switch on the electrical power.
16. Refer to Pre-Start instructions, the next page.
NME654R & FME804R
January 2000
Page 12