Double system rl, Operation – Scotsman FME24RLM User Manual
Page 12

OPERATION
Water
Water enters the machine through the 3/8" male
flare at the rear of the cabinet, goes to the water
reservoir which it enters through the float valve.
The water then goes out the bottom of the
reservoir tank to the bottom of the evaporator.
Reservoir overflow or evaporator condensation is
routed to the drain.
Double System RL
November 2000
Page 12
WATER
INLET
RESERVOIR
ICE CHUTE
WATER LEVEL
EVAPORATOR
WATER INLET
DRIP PAN DRAIN
WATER SCHEMATIC
See also other documents in the category Scotsman Equipment:
- Prodigy Plus D Series (23 pages)
- C1030 (23 pages)
- Prodigy Plus D Series Remote Condenser Modular Cuber (26 pages)
- N1322 (54 pages)
- DC33 (26 pages)
- C2148W (25 pages)
- C1848 (22 pages)
- C2148R (26 pages)
- CU3030 (104 pages)
- EH430 D (31 pages)
- N1322 (24 pages)
- N1322 (18 pages)
- N1322L (18 pages)
- AFE424 (15 pages)
- AFE400 (25 pages)
- C2648R (25 pages)
- CU0920 (17 pages)
- CU0920 (31 pages)
- CB1030 (43 pages)
- CU3030 (18 pages)
- CU50 (16 pages)
- FME804 Installation (16 pages)
- FME804 Installation (32 pages)
- NB1322 (37 pages)
- HD30 (18 pages)
- HID540 Service Manual (41 pages)
- HID540AW (20 pages)
- MDT4F12 (16 pages)
- SCCP30 (15 pages)
- SCCP30 (30 pages)
- SCN60 (18 pages)
- SCN60 (38 pages)
- MDT5N40 (16 pages)
- TDE650 (33 pages)
- SCR33 (20 pages)
- ECC1800 (4 pages)
- SCCP50 (33 pages)
- SCV32 (16 pages)
- 2000 Prodigy Eclipse (50 pages)
- EH222 with ECC (57 pages)
- Nugget Ice Machines (22 pages)
- CME650 (24 pages)
- CD200 (19 pages)
- CME1656 (43 pages)
- CME456 (42 pages)