Remko smart wp manager – REMKO WPM-Smart-Control-Manual for specialists-WKF-085 User Manual
Page 38

4.2
Template hydraulic diagrams with installation parameters
NOTICE!
The following template hydraulic systems are only to be used as a planning aid, and do not replace an
installation drawing! Technical modifications reserved!
The design and planning of customer-provided hydraulic systems must be performed by a specialist
installer!
We recommend adapting plant-specific parameters, such a heating limits and bivalence point, to the
design data!
You can find further hydraulics examples at www.remko.de
Hydraulic diagram for heat pump assembly WKF Köln
Functions: heating or cooling, operating mode: monoenergetic or bivalent alterna-
tiveOnly one cycle is possible for cooling; active cooling or floor heating (passive cooling)
The operating mode here can only be monoenergetic or bivalent alternative!
A
B
C
D
HK
FB
KK
B
AB
A
HGM
HGU
Fig. 67: Example hydraulic diagram for HP assembly WKF Köln
A:
Outdoor unit
B:
WFK indoor unit
C:
Storage tank
D:
Second heat generator (max. 20 kW)
FB:
Floor heating cycle
HK:
Heater heating cycle
KK:
Cooling cycle
REMKO Smart WP MANAGER
38