4 positioning of the electric cables, Remko pump groups hgm / hgu – REMKO HGM-HGU User Manual
Page 16

2
4.
Insert the insulation (3) by pushing down the
top side of the rear insulation half-shell (2).
2
3
5.
Continue as described in point (9) for wall
installation.
6.
Open the ball valve of the return flow again.
7.
Install the electric cables (see: positioning of
the cables section).
8.
Close the pump group using the front part of
the insulation (1).
2
1
4.4
Positioning of the electric
cables
The electric cables must be installed by qualified
personnel, in order to avoid endangering people's
safety and material damage. The insulation half-
shells were developed in such a way to ensure the
greatest degree of flexibility possible with regard to
cable arrangement in the insulation. There are
appropriate recesses for cable harnesses and
these enable side access to the insulation (2).
2
REMKO PUMP GROUPS HGM / HGU
16