Certification for Initial Operation

Date 01/2005

Initial Operation

Subsequent Operation

of a REMKO air-conditioning system

The room air conditioning system above was put into operation without any objections.

The operator has been trained and the operating instructions distributed.

The unit could not be put into operation for the reasons indicated above.

Company:

Street:

Postal code, city:



Stamp and signature

Executing company:

Date

Operator

signature

Unit data

Outdoor unit

Indoor unit

Type of unit

Unit number

Refrigerant pipe length/height

———–

m/ m

Oil elevation arcs

———–

units

Additional refrigerant amount

g

———–

Condensation pump

———–

Operator / Setup location

Name:

Street:

Postal code, Country, City:

Telephone:

Fax:

Test of cooling cycle

Result

Visual check:

Setup of outdoor unit and indoor unit

5

good

4

poor

Heat-exchanger, insulation, pipes

5

good

4

poor

Electrical fuse protection type A

5

good

4

poor

Electrical power/control line Cu (mm² / mm²)

/

5

good

4

poor

Impermeability check:

Vacuum mbar

5

good

4

poor

Excess pressure mbar

5

good

4

poor

Add. preparation:

Refrigerant refill amount g

5

good

4

poor

Shut-off

valves

open

5

good

4

poor

Functional check:

Condensation

flow,

condensation pump(s)

5

good

4

poor

Cooling

mode

5

good

4

poor

5

good

4

poor

Operational check:

Compressor

mode

5

good

4

poor

Fan

mode

5

good

4

poor

Measurement tests:

Room temperature / Air outlet temperature °C / ° C

/

5

good

4

poor

Suction temperature / Overheating °C / K

/

5

good

4

poor

Comments:

Signature of person assembling unit